Full House Renovation Costs in the UK: A Realistic Guide

Ask three builders what a full house renovation costs and you will get three different answers, because the honest answer is that it depends on the house, the spec and how far you take it. That said, there are realistic ranges you can plan around. Here is a straightforward breakdown from a Lincoln renovation firm, with the numbers we actually see on jobs.

Published 11 August 2026

The headline figures: what full renovations tend to cost

For a full renovation of a typical three bed house, most UK projects land somewhere between £45,000 and £120,000. At the lower end you are refreshing every room, replacing the kitchen and bathroom, redecorating throughout and sorting flooring, but keeping walls and services largely where they are. At the upper end you are rewiring, replumbing, replastering, fitting a new heating system and reconfiguring the layout, essentially taking the house back to brick.

A useful rule of thumb is £1,000 to £2,000 per square metre for a back to brick renovation, with £2,500 plus per square metre once you add extensions or high end finishes. In Lincolnshire, labour rates are generally kinder than London or the South East, so local projects often sit towards the lower half of national ranges. A Victorian terrace off Monks Road will still throw up different surprises to a 1970s house in North Hykeham, though, so the age and condition of the property matters as much as the postcode.

Where the money actually goes

Homeowners are often surprised that the glamorous parts, the kitchen and bathroom, are not the biggest line items. The invisible work usually is. A full rewire on a three bed house typically runs £4,000 to £8,000. A new central heating system with boiler is often £5,000 to £9,000. Replastering throughout can add £5,000 to £10,000. None of it photographs well, but skipping it in an older property is how renovations go wrong later.

On top of that, budget roughly £10,000 to £25,000 for a new kitchen fitted, £5,000 to £12,000 per bathroom, and £3,000 to £8,000 for flooring throughout, all depending heavily on spec. Structural changes such as removing a load bearing wall usually cost £2,000 to £5,000 including the steel, structural engineer's calculations and making good.

What pushes the price up, and what keeps it down

The biggest cost drivers are the age and condition of the property, how much of the layout you change, and your finish level. Older Lincoln housing stock frequently hides damp, tired wiring, and lime plaster that crumbles the moment you touch it. Listed buildings and homes in conservation areas, of which Lincoln has plenty, add cost through material requirements and consent processes.

You keep costs down by keeping kitchens and bathrooms in roughly the same position so drainage and pipework stay put, choosing mid range finishes in most rooms and spending selectively where it matters, and making decisions early. Changing your mind after first fix is one of the most expensive habits in renovation. A detailed, itemised quote before work starts, rather than a single round number, also makes it far easier to control the budget as the job progresses.

Budgeting sensibly: contingency, VAT and phasing

Whatever figure you land on, hold back a contingency of 10 to 20 percent, and lean towards 20 percent for anything pre war. You do not know what is under the floorboards until they come up. Remember that quotes from VAT registered firms will have 20 percent VAT on top unless it is already shown, so always check whether a figure includes it.

If the full scope stretches the budget too far, phasing is a legitimate approach. Get all the disruptive infrastructure done first, the rewire, heating, plastering and any structural work, then complete rooms in stages. It costs slightly more overall than doing everything at once, but it beats cutting corners on the fundamentals to afford a nicer kitchen.

Common questions

Frequently asked.

How long does a full house renovation take?
A full renovation of a three bed house typically takes three to six months on site, longer if there are structural changes, planning consent or a listed building involved. Add time beforehand for design, quotes and ordering materials with long lead times such as kitchens and windows.
Can I live in the house during a full renovation?
You can, but for a back to brick renovation most people are happier moving out, as you may be without heating, water or a working kitchen for weeks at a time. If moving out is not an option, ask your builder to phase the work so one part of the house stays habitable.
Do I need planning permission for a full renovation?
Usually not for internal work, which falls under permitted development, though building regulations approval still applies to electrics, heating, structural alterations and new windows. You will need planning consent for most extensions, and listed building consent for almost any alteration to a listed property, so check with the local council early.